If this document does not correspond to your current software version, you can go to Download Center to find other available document versions.

QNAP

QuTS hero 5.0.x

Download (PDF)

Scheduled SnapSync Job Status

Status

Description

Idle

The job is not currently running.

Starting

SnapSync is preparing to run the job.

Ready

The job is not currently running. This status appears after deleting a SnapSync job, and then creating a new job with the same name and the same source and destination.

Updated

The job has finished running. The source was synchronized to a destination on a remote NAS.

Local Updated

The job has finished running. The source was synchronized to a destination on the local NAS.

Suspended

The job was suspended by a user who clicked Suspend job on the source or destination NAS.

Not run yet

The job was created but has not been run.

Updating

The job is running. SnapSync is synchronizing data from the source folder to the destination folder.

QuTS hero displays the data transmission speed and synchronization progress as a percentage.

Disconnected

The two NAS devices are disconnected.