If this document does not correspond to your current software version, you can go to Download Center to find other available document versions.

QNAP

QuTS hero 5.0.x

Download (PDF)

Configuring the Power Schedule

  1. Go to Control Panel > System > Power > Power Schedule.
  2. Select Enable schedule.
  3. Perform any of the following tasks.

    Task

    User Action

    Add a scheduled action

    Note:

    One schedule is shown by default.

    1. Click Add.

    2. Select the following.

      • Action: Select whether you want to shut down, restart, or turn on the NAS.

      • Schedule Type: Select the frequency of the action.

      • Hour and Minute: Select the time of day to perform the action.

    Remove a scheduled action

    1. Select one or multiple schedules.

    2. Click Remove.

  4. Optional: Select Postpone scheduled restart/shutdown when a replication job is in progress.
  5. Click Apply.